⚠️ Important:
The Point Cloud Tasks (PCTs) Tab in the Table of Contents (TOC) was deprecated in v2025.2 when the functionality of this tab was moved to the Point Tasks tab of the ribbon. Legacy users should dismiss the tab or enable the Hide PCT Tab in TOC (Requires Restart) option in the Project Settings -> EXP tab to remove the dummy tab from the Table of Contents.
The Point Cloud Tasks (PCTs) Tab in the Table of Contents (TOC) was deprecated in v2025.2 when the functionality of this tab was moved to the Point Tasks tab of the ribbon. Legacy users should dismiss the tab or enable the Hide PCT Tab in TOC (Requires Restart) option in the Project Settings -> EXP tab to remove the dummy tab from the Table of Contents.
The Point Cloud Tasks (PCTs) Tab located in the Table of Contents (TOC) is used to edit and apply changes to existing PCTs. This dialog is also where the PCT Manager dialog can be opened.